INCREDIBLE! AN INVISIBLE CLIMATE PLANT?! THAT'S HOW.

 

With a plasterboard ceiling you can.

Being able to air-condition your home both in summer and winter has now become a fundamental requirement of each of us.

The benefits of a pleasant and constant temperature within an environment are reflected in everyday life and improve the physical and mental well-being of the people living in it.

 

The newly built houses already include a climate control system that is masked in the false ceiling or in the counter-wall that is specially designed during the design phase.

In old houses, on the other hand, we can intervene in the restructuring phase by specifically creating structures that hide the machinery and the pipes of the climate system.

The basic steps to follow are listed below:

1. System design

This first step will be dealt with and programmed with the help of a professional or an expert in air conditioning, who will study the route of the pipes, will indicate that the space will have and how much it will be necessary to lower with the false ceiling.

The innumerable rules that constrain the realization of a false ceiling and in particular of a conditioning system inside a dwelling make sure that the opinion of experts of the sector is fundamental in order to respect the same (for example, the regulation of compliance of the net useful height of 2.70 meters and only in some areas of the house the possibility of reaching a minimum of 2.40 meters).

2. Positioning of the machinery

There are many types of air conditioning systems, but the most used for systems inside the houses is certainly the ducted air conditioning system with heat pump.

This system provides a machine with a considerable bulk that, through a system of pipes positioned on the ceiling, brings the air into the various rooms, emanating it through grilled nozzles located very often above the doorway.

As said, the machinery being very large should be placed in a strategic place that often appears to be on an external wall of the house.

3. Graphic development of the project

Having studied the mapping of the pipes and the positioning of the main machine, the technical design of the false ceiling structure to be carried out will have to be carried out.

While designing the design, it will also be necessary to take into account the insertion of the lighting system into the false ceiling.

As for the shape to be attributed to the design, we will proceed simply by following our own tastes.

4. Implementation of the project

At the end of the graphic design phase, we move on to the evaluation of the best construction technique to be used for the actual implementation.

 

Suggestions

In a project like this that involves the modification of the building's installations and the creation of a false ceiling that will probably also upset the lighting of the environment, it is essential to carry on the work with the help of expert and qualified staff, thus obviating to a series of technical problems that could arise.

In fact, nothing should be left to chance and every space should be designed to be lived in the best possible way.

Finally, it will be important to evaluate the available spending budget and the time it takes to realize it.